Manufacturing Process

Each Swinging Sticks is hand crafted, and takes expert artisans almost a full day to make each sculpture. Every sculpture takes between 8-10 hours to achieve perfect balance and then are let to run for 7-10 days to ensure the highest product quality.

If there are any fluctuations and the product is not absolutely perfect than it is destroyed because they cannot be repaired. Once the products are tested at the factory, they are packaged and shipped out to respective distributors.

Once they get to the distributors location after being shipped across the oceans or by plane, the Swinging Sticks are checked once more in order to ensure perfection. In fact, some of the only problems with the sculpture come from the pin being misaligned while during shipping from distributor to customer.